Bio-rad ChromLab™ Software Manuale Utente Pagina 283

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 306
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 282
Plumbing NGC Systems
Instrument Guide | 281
To plumb the buffer inlet valves
1. Connect tubing from Outlet A on the buffer blending valve to port 8/BB on
buffer inlet valve A.
2. Connect tubing from Outlet B on the buffer blending valve to port 8/BB on inlet
valve B.
3. Connect tubing from the Out port on inlet valve A to the inlet manifold of system
pump A.
4. Connect tubing from the Out port on inlet valve B to the inlet manifold of
system pump B.
5. (Optional) Connect inlet tubing to ports 2–7 on both buffer inlet valves A and B.
To plumb the sample pump
1. Connect inlet tubing to the sample pump inlet manifold.
2. Immerse the other end of the inlet tubing in a bottle of degassed, deionized
water.
3. Connect outlet tubing to the Sample Pump port on the sample inject valve.
Vedere la pagina 282
1 2 ... 278 279 280 281 282 283 284 285 286 287 288 ... 305 306

Commenti su questo manuale

Nessun commento