Bio-rad ChromLab™ Software Manuale Utente Pagina 123

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 122
Plumbing NGC Systems
Installation Guide | 121
2. If your system has two sample inlet valves:
a. Connect tubing from the Out port on sample inlet valve 1 (S1) to the
sample pump inlet manifold.
b. Connect tubing from the Out port on sample inlet valve 2 (S2) to port 8 on
S1.
c. Connect inlet tubing to ports 1–7 on S1 and to ports 1–8 on S2 as needed.
3. Immerse the inlet tubing in sample containers.
Plumbing Outlet Valves
Each outlet valve module includes all necessary tubing. The tubing is approximately
5' (1.5 m) in length. Determine the length of tubing you need and cut it to the
appropriate length.
To plumb the outlet valves
1. If your system has only one outlet valve:
a. Connect tubing from the Out port on the conductivity monitor or pH
monitor to the In port on the outlet valve.
Vedere la pagina 122
1 2 ... 118 119 120 121 122 123 124 125 126 127 128 ... 177 178

Commenti su questo manuale

Nessun commento